Promix 3in1 Cold Asphalt


Why we name it as 3in1? Is it like 
3in1 coffee? Yes, we want to be coffee anytime anywhere we can drink coffee when we need.So like asphalt, our ultimate goal is to have everyone to use a easy and simple way to make cold asphalt. And you can make it, apply it and use it at Anytime and Anywhere! 



More Product Application please follow our Social Link:






STEP 1 – MIX


Mix the chip stones and quarry materials with the CM-120 Cold Mix Binder evenly using a shovel, prepare your own Cold Mix Asphalt.






STEP 2 – CLEAN


Clean and clear the repair area of all loose materials. Take note the repair area surface can be damp but not having standing water. The balance CM-120 Cold Binder can use as prime coating on the repair area to strengthen
the repair area






STEP 3 – POUR


Fill the repair area with the prepared Cold Mix Asphalt





STEP 4 – PATCH


Use to shovel to place sufficient quantity of Comd Mix Asphalt evenly into the repaired area.





STEP 5 – COMPACT


Compact and if necessary add in additional Cold Mix Asphalt to bring the repair to the same level of the existing pavement surface





STEP 6 – FINISH


Finish up the job and open to traffic